Public Sector Solution

Fire Drill Route Recording

Record participant routes and checkpoint arrival times to evaluate drill performance with objective data.

Record checkpoint arrival times, drill duration, and movement routes

Crew members wear a UWB Tag, and TwinTracker UWB is installed on the training tower and mock structures. Entry time and arrival time at each section are recorded, leaving an individual route for each person. Radio conditions differ between outdoor areas and the inside of the tower, so receiver quantities are calculated section by section.

TwinTracker UWB
TwinTracker UWB

TwinTracker UWB

The reader installed across the training area to determine crew positions. An open outdoor course, the inside of a training tower and an underground mock structure have completely different radio conditions, so each section is designed separately. Deciding first whether evaluation needs floor level, zone level or coordinates for each section means the whole ground does not have to be covered at the same density, and metal and concrete sections go through verification in advance.

samsung
kia
gs-eps
hankook-driving-emotion
xi-snd
autoplus
posco
lg-chem
samsung-cnt-corporation
samsung
kia
gs-eps
hankook-driving-emotion
xi-snd
autoplus
posco
lg-chem
samsung-cnt-corporation

Checkpoint Arrival Time Recording

Crew movement paths and arrival times at each section are recorded, and the number entering and remaining is checked during the drill. Records by team and round serve as material for comparison against the evaluation criteria the instructor sets.

Training Route Heatmap

Heatmap of training movement

Once the drill ends, the areas where crews actually spent time appear in color. Which zones drew people and which nobody passed through shows in a single image, so the debrief runs on a screen rather than on memory and impressions. Overlaying rounds also shows whether the same zone stays empty every time.

Individual Route Analysis

Individual routes examined in detail

Each crew member's route is retraced in time order. Entry time, arrival time at each section and dwell time remain together, narrowing down where the delay happened section by section. Laid out round by round, whether repeated training actually shortened the time shows in numbers, and that material goes straight into the evaluation report.

Location Accuracy Validation

Floor and zone position on the training ground

Check which floor and zone each crew member is in during the drill. Position is calculated from tag signals collected by TwinTracker UWB and shown on a plan that reflects the training ground structure. Receiver placement and obstruction by structures set how finely positions can be separated.

Real-Time Training Monitoring

Live monitoring while the drill runs

While the drill is under way, the screen shows which crew member is in which zone. The controller gives directions from the screen instead of asking for positions over the radio, and checks how many have entered and who has not come out yet. Headcount per zone is shown alongside, so a crowd building up in one section is visible as it happens.

Location monitoring across the training ground

Crew positions are checked on a plan that reflects the training ground structure. Receiver and tag placement and signal reception are managed to run monitoring across the training area.

Custom Site Installation

Installation designed on the site drawing

A floor plan marking TwinTracker UWB mounting points and cable routes on the training ground drawing comes first. Because the quantity needed changes with stairwells and pillar positions, the configuration and construction scope are fixed at the drawing stage and the quote is calculated from there. If the training layout changes, the equipment can be moved to cover a different area.

On-Site Tag Signal Reception

On-site installation and tag reception

Receivers mount on the drill tower and mock structures to pick up signals from the tags crews wear. Because the facility stays in service, they are mounted in a way that minimizes drilling and cabling, and the tag mounting method is decided against both wearing over turnout gear and withstanding impact during the drill. Sections where the signal dropped are listed so they can be reinforced before the next round.

Training Ground Visualization

A view that mirrors the training ground

Positions are checked on a view that reproduces the floors, stairs and approach routes of the training ground. Plane coordinates alone do not convey which floor or which section, so only a view that reflects the real structure lets the controller judge at a glance. When structures are moved or the training layout changes, the view is updated with them.

Installation-to-3D Modeling

From installation drawing to 3D view

Architectural drawings are used to build the training ground as a three-dimensional view with positions placed on top. Where floors overlap, a plan alone does not read, so both a floor-by-floor view and a whole-site view are provided. Deployment and operation stay inside the organization's internal network and training records never leave it.

ORBRO Inquiry

Implement ORBRO Solutions with Experts

We provide world-class technology and experience.